![]() |
|
SDV Geis organized the shipment of an 80-tonne cement gear unit by air-freight from Cologne, Germany to Hyderabad, India. The spectacular loading procedure took seven hours to complete at Cologne/Bonn Airport, with the gear unit carried by an Antonov 124 |
![]() |
|
The 80-tonne gear unit covers an area of just 4.5 x 3.5 metres |
![]() |
|
The logistics experts arranged for a mobile chassis to be brought over especially from Stansted Airport in the UK to carry the gear unit. |
![]() |
|
Thanks to the efforts of SDV Geis employees, the gear unit was securely conveyed through the 6.40-metre-wide and 4.40-metre-high „nose door“ of the Antonov and into the aircraft‘s cargo hold. |